print

Autoliv Administrative Building

Program: Office
Timing: 2014 (design) - 2015 (execution)
Client: Autoliv Romania
Status: Built
Site area: 62.400 sqm
Built area: 2.000 sqm
Team: Nicolae Taric, Bogdan Lupescu, Stefan Olah
Collaborators: Steel Design, Termoconsult, ICCO Facility management

Within the Autoliv Brasov industrial assembly has been realized this administrative building in which shall be carry out management duties of the platform. With such an important function for the local management of the Autoliv company, but also for local and external links, it was intended to be representative / special in the assembly. The administrative building accommodates strictly the function for offices, being connected to the production area through a covered walkway, and has important spaces as: a representative reception in the two levels lobby, conference / training rooms, meeting rooms, a panoramic cafeteria and discussion areas.

© 2011-2023 Adastudio. All rights reserved.