Program: | Production and research facilities |
Site: | "ICCO Industrial Park" |
Timing: | 2015 - 2016 |
Client: | Continental Powertrain Romania srl |
Status: | Built |
Site area: | 59.986 sqm |
Built area: | 1.886 sqm |
Team: | Lorand Bartha, Deea Ursachi |
Collaborators: | Sellm, Electric Eye, Civil Proiect |
In the automobile industry products must be tested to ensure quality before mass production. Therefore, this testing laboratory serves the existing plant which produce supply fuel units (fuel pumps). These auto parts have to be tested under real conditions. Because there are various engines and areas for sale, fuel sources used are different (for example: diesel, gasoline, dual fuel: gasoline with ethanol, diesel with biodiesel etc.).